Workplace charging€2,000 - €5,000 per point
The objective is regulatory compliance and service to employees. The cost factor is the number of spaces. The unit cost decreases when several spaces are electrified at once thanks to dynamic load management, which avoids subscribing to costly new power capacity. The standard solution is AC charging points from 7.4 to 11 kW. The average investment is €2,000 to €5,000. per point (turnkey).
Last mile€50,000 - €250,000
The charging point is a production tool, so reliability is non-negotiable. The cost factor is simultaneous power. Adapting a depot to charge 50 vans at the same time requires precise energy management to keep the energy bill under control. The standard solution is a strategic mix of overnight AC charging (11-22 kW) and backup DC charging points (50 kW+). The average investment for medium depots (10-20 vehicles) ranges between €50,000 and €250,000., depending on existing grid capacity.
Heavy dutyCustom projects
High-engineering projects for electric trucks and buses. The cost factor is high power (>150 kW per point) and MV (medium-voltage) connection. The standard solution is HPC (high-power charging) chargers. The average investment is project-specific and exceeds hundreds of thousands of euros., where TCO and diesel fuel savings are the only viable justifications.