Solutions · Installation

Turnkey business EV charging installation

People walking past cars and a Swish charging totem outside an office building
Your challenges

Our expertise makes installation simple

  1. Technical chaos

    Managing technical requirements, permits and construction work without in-house expertise is a risk.

    How Swish improves itCertified technicians manage the entire deployment, from installation works to the final connection.See how

  2. Initial investment

    High entry cost (CAPEX) slows down electrification. You need OPEX options.

    How Swish improves itYou can choose between owning the assets (CAPEX) and our comprehensive service model (OPEX).See how

  3. Insufficient grid

    Fear of overloading the building’s electrical grid without smart management.

    How Swish improves itWe design modular infrastructure with dynamic load balancing that makes the most of your current power.See how

The solution

Your scalable, neutral EV charging project

  1. Impartial, consultative site survey

    We are not manufacturers. We analyse your operations (routes, stop times) to prescribe the exact technology you need, without conflicts of interest.

  2. Certified installation and connection

    Certified technicians manage the entire deployment, from installation works to the final connection.

  3. Commissioning and user training

    Charger configuration, rigorous operational tests and training for your teams on the equipment and management tools.

Our process

Our installation process in 4 stages

Stage 1

Technical visit and site survey

The process begins with an in-depth on-site analysis by our certified technicians. We assess available electrical power, the constraints of your current infrastructure and your specific operational needs. This initial diagnosis is crucial to identify any prerequisites and to confirm the technical and financial viability of the project from day one.

Stage 2

Engineering and design

We design the most relevant technical and software architecture for your company. Our engineering team produces detailed sizing and precise technical plans, selecting the hardware-agnostic technology that best suits your fleet, whether AC or DC. We also prioritise scalability, building modular infrastructure that lets you add charging points later without costly reconfiguration. You receive a transparent quote with no surprises.

Stage 3

Deployment and installation

We take care of everything, so you do not have to worry. We fully manage the connection works, cable laying and physical installation of the charging points, ensuring strict compliance with all current safety regulations and keeping disruption to your daily activity to a minimum. At the same time, we guide you through the administrative procedures and grid connection permits, or manage them directly, to simplify the process.

Stage 4

Commissioning and handover

Once the physical installation is finished, we activate and rigorously test each charging point to ensure optimal operation. We integrate the chargers into our SwiGo platform for immediate supervision and install the corresponding signage. Finally, we train your teams on the hardware and management software and deliver the complete Electrical Installation Certificate (As-Built File), so your infrastructure is ready to operate.

Chargers

OCPP/OCPI charging points for interoperability and high performance

AC chargers

3.7 kW to 22 kW

AC charging points (alternating current)

The efficient solution for day-to-day charging. Ideal for long parking times, with power from 3.7 kW to 22 kW. These robust chargers, available as wall-mounted or pedestal units, deliver reliable daily charging. With OCPP connectivity and an integrated MID meter, they enable smart energy management and optimise consumption without overloading your building’s grid.

DC chargers

50 kW to 150 kW

Fast DC charging points (direct current)

Operational agility for your fleet. Designed to minimise downtime, these chargers from 50 kW to 150 kW allow rapid rotations. They suit delivery fleets and urban logistics that need short stops. Their scalable, modular architecture lets you adapt power as your needs grow, and they integrate seamlessly into our SwiGo supervision platform.

HPC chargers

up to 350 kW, 600 kW modular

Ultra-fast DC charging points (HPC, high power)

Extreme performance for heavy vehicles. The answer to the most demanding energy needs, with power of up to 350 kW and even 600 kW in modular configurations. These charging points drastically cut waiting times, making it easy to charge during drivers’ mandatory breaks or at logistics hubs. They use robust, cutting-edge technology (IP55/IK10) and are compatible with distribution satellites.

Illustration

From daily AC to high-power DC

Select a tier to highlight it. Everything complies with OCPP and OCPI.

Bar length shows relative power only. Illustrative values.

Financing

Flexible financing models, with investment integrated into deployment

CAPEX or OPEX, aligned with your economic goals

At Swish, we make sure your infrastructure is built in line with your economic goals from the design phase. With CAPEX, you fund the works and own the equipment immediately. With our OPEX formula, the installation cost becomes an operating service, as we finance and carry out the entire technical deployment. You receive a turnkey installation ready for operation, paid through service fees, which protects your cash flow and leaves the technical complexity and long-term asset management to us.

Who paysHow the money flows
Upfront investmentYou invest once, at the start.
Who ownsWho holds the asset
You own it from day one
Who runs itWho operates the site
Swish supervises and maintains it
Who paysHow the money flows
A fixed monthly fee throughout the contract.
Who ownsWho holds the asset
Swish owns and operates itOwnership transfers to you
Who runs itWho operates the site
Swish handles supervision, maintenance, energy purchase and billing
  • You own the asset from day one
  • Swish maximises subsidies, with grants up to about 40% of eligible costs
  • Supervision and maintenance by Swish
  • Delivered turnkey by Swish
CAPEX

You want to own the asset from the start and benefit directly from subsidies.

  • Swish finances the project in whole or in part
  • A fixed, predictable monthly fee
  • Operational risk stays with Swish
  • Revenue sharing on public or semi-public charging sessions
OPEX

You prefer a predictable monthly fee and want the operational risk to sit with Swish.

Illustrative timeline, not to scale.

Benefits

Request a site survey and simplify your installation

  1. Turnkey installation with no surprises

    We remove technical and administrative complexity. Our certified experts manage the entire cycle, from site survey and engineering to permitting and commissioning, keeping interruption to your daily operations to a minimum.

  2. Scalable and efficient design

    Prepare your company for the future without cost overruns today. We design modular infrastructure with dynamic load balancing that makes the most of your current power and lets you expand your charging network easily as your fleet grows.

  3. Total financial flexibility

    Adapt the project to your capital strategy. Choose between owning the assets (CAPEX) and our comprehensive service model (OPEX), which lets you install without affecting your cash flow.

FAQ

Questions about installation.

13 questions

How long does the complete installation process (from site survey to commissioning) usually take?

The total duration depends on the project’s complexity. After the initial technical visit, engineering and design usually take a few weeks. Deployment, which may include civil works and physical installation of the charging points, ranges from a few days for a simple installation to several weeks for a large-scale project. Commissioning and final handover take a few more days. On average, expect between 1 and 3 months from start to finish. We provide a precise schedule after the initial site survey.

What site preparation do we need to do before installation?

After our technical visit and initial survey, we will tell you precisely what preparation is needed. This generally means ensuring easy, safe access for our teams to the installation areas (electrical panel, cable route, charging point locations). We assess the capacity of your electrical infrastructure and will discuss any major upgrades with you. For everything else (connection, installation, hook-up), Swish takes care of it.

Does Swish handle the necessary administrative procedures, such as permits and grid connection authorisations?

Our offer is designed to keep the process as simple as possible. We guide you through the necessary administrative procedures. Depending on the project’s complexity and local regulations, we can guide you or handle certain procedures directly, such as connection requests to the grid operator.

What happens once the installation of the charging points is finished?

Once the physical installation is complete, we move to final commissioning and handover. This includes activating and rigorously testing each charging point, integrating it into our SwiGo supervision platform for tracking and management, and installing the necessary signage. We then give your teams complete training on the hardware and software, and finally deliver the complete Electrical Installation Certificate. Depending on the chosen financing model, we also handle continuous supervision and maintenance.

Which brands of charging points do you usually install?

At Swish, we are not tied to a single manufacturer. We select and install state-of-the-art charging points from the best manufacturers on the market, based on the technology that best fits your operational needs in power, functionality and budget. During the site survey, we advise you on the most relevant brands and models for your project.

What are the main factors that affect the cost of installing EV charging infrastructure?

Several factors determine the total cost. Power and number of charging points directly affect equipment costs. Site complexity matters too, including the state of your electrical infrastructure, the distance between the electrical panel and each charging point, and any civil works (trenches, concrete bases). Options and features such as advanced supervision, dynamic load balancing or integration with other systems can also influence cost, as can local regulatory requirements. Our detailed quote after the initial site survey takes all of these into account transparently.

How do you manage the electrical load so charging points do not overload our building’s capacity, especially at peak times?

This is a crucial aspect that we assess from the site survey phase. We analyse available power and the capacity of your electrical panel. If necessary, we integrate dynamic load balancing, which intelligently distributes available power among active charging points, avoiding overloads while optimising your fleet’s charging.

What is the warranty period for installed hardware and installation labour?

Installed hardware comes with the manufacturer’s standard warranty, usually 2 to 3 years depending on brand and model. Swish also guarantees the quality of its installation work in line with current regulations and best sector practice. Specific warranty details come with our commercial proposal.

Can the charging infrastructure be integrated with our existing building management systems (BMS) or energy management systems (EMS)?

Yes, most professional charging points we install are connected and can integrate with third-party systems, such as a BMS or EMS, via standard protocols (OCPP). During the engineering phase, we study integration options with your existing infrastructure for centralised, optimised energy management.

What reporting functions and data does the SwiGo supervision platform offer?

Our SwiGo platform offers complete tracking and remote management of your infrastructure. You get detailed data on charging point usage (consumption per session, duration, user), real-time status and revenue generated (if applicable), plus customisable reports to analyse trends, optimise fleet management and monitor key performance indicators.

Can charging points be customised with our company’s brand image (logos, colours)?

Yes, many manufacturers offer customisation options. We can add your logos and choose specific colours so the infrastructure blends into your environment and reinforces your brand image.

Can Swish help us identify and apply for government grants for EV charging infrastructure?

Yes, of course. Our service includes help identifying the grants and subsidies your project is eligible for. We can guide you through the application process to optimise your investment and reduce the TCO of your installation.

What geographic areas do you cover for installation projects?

Swish operates mainly in France, Italy and Spain, with a strong regional presence through our local branches for proximity and responsiveness. We can also support existing clients on projects in other European countries. Contact us to discuss your project.

Next step

Tell us about your project.

A single point of contact from site survey to daily operation.

Also of interest Maintenance · Supervision

Tell us about your project

Short form. We reply with next steps.